The project involved the installation of a new freight rail track as part of the upgrade of the Port Botany Container Terminal
Client: Savcor
Duration: 2010
Scope of Works:
Civil & Tunnel were engaged by Savor (on behalf of Downer) to supply & construct multiple utility protection slabs ranging in size up to 0.8d x 15l x 10w adjacent to the live freight rail corridor. The scope included: